Free white paper · Masterclass
Capacity Planning, End to End
Turning a volume forecast into a monthly FTE plan and a recruitment schedule that respects ramp, attrition and budget.
Capacity planning is the most strategic seat in the planning function — the bridge between a forecast and a headcount budget, and where the biggest, earliest and most expensive decisions get made. This masterclass walks the whole chain: from a forecast to a required-FTE profile, through the three drags that make “required heads” and “recruited heads” different numbers, into a back-planned recruitment schedule and a required-vs-available plan, and finally into a business case finance will actually approve. Worked numbers throughout.
Get the paper by email
Enter your email and we’ll send you the PDF — and add you to the fortnightly ccPlanning newsletter. Unsubscribe any time.
Delivered via Buttondown. We’ll never share your address. By subscribing you join the ccPlanning newsletter.
Thanks — your download is ready
Check your inbox for the newsletter confirmation too. If the download doesn’t start, use the button below.
Download the PDF (9 pages)What’s inside
- What capacity planning is — the three horizons and why lead time makes it a distinct job
- From forecast to FTE — the gross-up chain (workload → service buffer → shrinkage), with a worked month
- The three drags — attrition, shrinkage and ramp, and why required heads ≠ recruited heads
- The recruitment pipeline — back-planning from go-live, funnel yield, the ramp curve, training throughput
- Building the plan — required vs available by month, reading the gaps, choosing the lever
- Scenarios & sensitivity — low/expected/high and a deliberate hedge
- Presenting it — the business case, the cost of inaction, the decision deadline
- The operating rhythm — a monthly cycle and an eight-point checklist, plus the FTE formulas
A masterclass in the ccPlanning series. Pair it with capacity planning for the next 12 months, the true cost of attrition, and the new-hire ramp-up curve.